Customer: EverPower Wind Holdings, Inc.
Location: Steuben County, NY
EPC Contractor: Gemma Renewable Power, LLC
Design Engineer: RRC / CG Power Solutions
Gemma Renewable Power began construction of the 4.10 MW Howard Wind Farm Expansion Project in the summer of 2012. The project required the installation of two additional REpower Systems MM92 wind turbine generators on 78.5m towers to the existing 51.25 MW Howard Wind Farm.
Gemma’s project scope consists of engineering, procurement and installation of access roads and access road extensions, WTG foundations, extension of the collection system, fiber optic cabling, pad-mounted transformers, modifications to the collector substation and two REpower Systems 2.05 MW MM92 78.5m wind turbine generators.
Access road construction commenced in July 2012 and turbine installation began in the fall of 2012. Commercial operation of the facility was achieved in December 2012.