Customer: Southern Sky Renewable Energy, LLC
Location: Canton, MA
EPC Contractor: Gemma Renewable Power, LLC
Design Engineer: Satcon / Construction Engineering Group
The Canton Landfill Solar Energy Project consists of 20,000 ground-mounted photovoltaic panels with a total generation output of 6 MW. The project is located on the capped and closed Canton Landfill, with power being supplied to the Town of Canton under a long-term agreement.
Gemma Renewable Power’s EPC scope of work included the design coordination, procurement and installation of the ground-mounted photovoltaic panels, along with the associated power conversion and interconnection facilities.
Commercial operation of the facility was achieved on Aug. 3, 2012.